Skip to content
  • Location: St. Joseph County, Indiana

Burgess & Niple (B&N) is serving as the technical advisor for the SR 2 & Larrison Boulevard New Interchange project in St. Joseph County, Indiana. The project is being delivered using the Progressive Design-Build (PDB) method, which enables early collaboration between design and construction teams to support innovation, improve constructability and proactively manage risk, cost and schedule. 

Technical Advisory Leadership Under Progressive Design Build 

In its advisory role, B&N supports the Indiana Department of Transportation (INDOT) through procurement of the Design-Build team and manages the preliminary design and preconstruction phase to guide the Design-Build team toward a guaranteed maximum price (GMP). B&N will continue providing technical advisory services through construction completion. 

Preliminary Design and Alternative Evaluation 

The project involves development of a new interchange, with preliminary design focused on evaluating multiple alternatives to identify an optimized solution that balances performance, cost and long-term constructability. 

Multidisciplinary Technical Oversight 

B&N provides comprehensive technical oversight across roadway design, hydraulics, bridge design, environmental permitting, maintenance of traffic and utility coordination to support coordinated project development and early risk mitigation. Independent cost estimating and early utility identification have been integral to improving cost certainty and informing design decisions. 

Collaborative Delivery Approach 

Overall, the SR 2 & Larrison Boulevard New Interchange project reflects a collaborative and forward-looking approach to infrastructure delivery in Indiana. B&N is leveraging its experience in alternative delivery and technical advisory services to support informed decision-making and successful project outcomes. 

Through its role as technical advisor, B&N is helping INDOT realize the full benefits of Progressive Design-Build delivery for the SR 2 & Larrison Boulevard New Interchange. By providing early technical oversight, independent cost control and proactive risk management, B&N is supporting informed decision-making, improved cost and schedule certainty and a well-coordinated design and construction process that positions the project for successful delivery and long-term performance.