Skip to content
  • Location: Phoenix, Arizona

B&N partnered with the City of Phoenix Water Services Department (WSD) to strengthen maintenance and reliability practices across its drinking water and wastewater treatment facilities, distributed facilities and collection and distribution systems.

Maintenance and Reliability Assessment and Roadmap

Strong maintenance practices within individual facilities provide a starting point for broader improvements across a large utility. B&N assessed WSD’s existing maintenance and reliability program to identify those strengths and opportunities to build on them across the organization.

The resulting roadmap included more than two dozen recommendations addressing maintenance planning, performance measurement, equipment condition and organizational responsibilities. B&N began implementing recommendations through initiatives that provided practical steps toward greater consistency across WSD.

Maintenance Performance Metrics

With WSD, B&N evaluated maintenance and reliability metrics from the Society for Maintenance & Reliability Professionals and other water and wastewater utilities. WSD selected seven measures, with performance targets informed by industry practices and its historical data.

For each measure, a metric definition sheet documents the required data, collection and reporting methods, staff responsibilities and follow-up actions. These sheets establish how performance will be evaluated and how results will inform maintenance decisions.

Predictive Maintenance Technologies and Motor Testing

Detecting emerging equipment defects gives maintenance staff time to plan corrective work before a failure interrupts operations. The B&N team developed a comprehensive predictive maintenance program for WSD’s critical equipment that incorporates ultrasound, infrared thermography, vibration analysis, oil analysis and on- and off-line motor testing.

Motor testing pilots at four water and wastewater facilities informed the program’s development. Also identified were the staffing, training and equipment needed for broader implementation and developed work orders and maintenance routes for direct entry into WSD’s maintenance management system, connecting the recommended technologies to daily maintenance activities.

Work Order Types and Priorities

B&N developed a simplified and structured work order priority framework to give facility staff greater flexibility to plan preventive maintenance and use available resources efficiently. The team also recommended additional work types to capture or document the follow-on work associated with addressing the defects discovered through preventive and predictive maintenance. Under this framework, each identified defect generates a separate follow-on work order. Tracking the resulting corrective work allows WSD to measure the effectiveness of both programs and refine maintenance strategies based on what inspections uncover.

Preventive Maintenance Standardization and Implementation Readiness

Maintaining consistent maintenance practices across diverse facilities and operational teams is a challenge for large utilities. B&N researched manufacturer manuals and industry guidance for over one hundred asset classifications and subclassifications and provided the foundation for standardized preventive maintenance tasks across the utility. The project manager recommendations accounted for equipment criticality and operating conditions when establishing the recommended preventative maintenance frequency for each asset.

The team also examined two years of historical work order costs to estimate the benefit-cost ratios of preventive maintenance optimization and predictive maintenance. This analysis gave leadership a financial basis for prioritizing implementation and allocating resources.

Organizational Review and Program Sustainability

Clear responsibilities are essential to sustaining maintenance improvements. By evaluating WSD’s asset management positions and job descriptions, B&N recommended organizational changes to support implementation of the Maintenance and Reliability Roadmap. Recommendations included additional staff to manage implementation of the predictive maintenance program, development and maintenance of strategic asset management plans and overall maintenance and reliability program function. 

These additional staff will also support the communication and change management necessary to build adoption of the Maintenance and Reliability Roadmap across WSD’s facilities and teams. By pairing technical improvements with practical workflows and clear ownership, the project provides a foundation for more consistent maintenance and effective use of staff resources. As implementation advances, these improvements will extend equipment life, reduce avoidable emergency repairs and support dependable water and wastewater services for the community.