  • Location: Steubenville, Ohio

When the City of Steubenville closed the Stone Arch No. 2 bridge in Beatty Park following the localized partial collapse of the bridge's upstream abutment and arch barrel end, B&N was engaged to determine whether the historic structure could be rehabilitated or if replacement was the only viable option.

Located within the 99-acre Beatty Park, Stone Arch No. 2 is one of the community's most recognizable historic features. Constructed in 1884, the sandstone arch bridge had deteriorated significantly over time due to age and scour-related damage. An earlier study concluded that rehabilitation would require complete dismantling of the arch, making restoration appear impractical.

Seeking a second opinion, the City of Steubenville retained B&N in 2022 to evaluate the condition of the bridge and compare rehabilitation and replacement alternatives. B&N's services included:

  • Structural assessment of the existing bridge
  • Hydraulic analysis to evaluate stream and scour conditions
  • Development of rehabilitation recommendations
  • Evaluation of five replacement alternatives
  • Cost comparison of rehabilitation and replacement options
  • Surveying and design services to support rehabilitation
  • Environmental study, documentation and coordination
  • Development of stone arch bridge rehabilitation plans

B&N's analysis demonstrated that rehabilitation was a feasible and cost-effective solution. Based on these findings, the city elected to preserve the historic structure. The project also helped support funding efforts, resulting in a Community Development Block Grant dedicated to the bridge's rehabilitation.

To support assessment, design and historic preservation efforts, the team used 3D reality-capture scanning technology to document the bridge's geometry, stonework and existing conditions. The resulting digital model provided accurate measurements for design while creating a detailed record of the structure before construction. A subsequent 3D scan of the structure at start of construction confirmed negligible change from the original scan, successfully refuting contractor concerns claiming substantially changed conditions.

B&N prepared rehabilitation plans including partial dismantling and reconstruction of the arch, selective sandstone block replacement, crack and joint repairs, drainage improvements, controlled density fill over the arch and temporary support systems during construction. These measures allowed the bridge's historic character to be preserved while improving long-term durability and reliability.

Today, Stone Arch No. 2 continues to serve Beatty Park visitors and the City of Steubenville while preserving an important piece of the community's history for future generations.

Honors & Awards

The Beatty Park Bridge Rehabilitation project has received the following recognitions:

  • 2025 County Engineers Association of Ohio – Historic Bridge Award
  • 2026 State Historic Preservation Office (SHPO) – State Historic Preservation Office Award